Analytical determination of acceptable limit of risk levels for the pipeline systems in an existing refinery depot plant

โ€”

by

[featured_image]
  • Version
  • Download 0
  • File Size 133.15 KB
  • File Count 1
  • Create Date October 23, 2026
  • Last Updated October 23, 2026

Analytical determination of acceptable limit of risk levels for the pipeline systems in an existing refinery depot plant

M. N. Idris and I. A. Abubakar


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *